Nike’s global headquarters required a high-performance flooring system capable of withstanding constant foot traffic, rolling loads, and daily operational wear while maintaining a clean, modern appearance. The project demanded coatings that could be applied efficiently with minimal disruption to active workspaces, while also ensuring long-term durability and resistance to abrasion, chemicals, and routine maintenance.
COMPANY
Nike
PROJECT NAME
Nike HQ floor coating
CONTRACTORS
Purcell Painting & Coatings
The Challenge
Why Wasser
Wasser Technologies was selected for its proven track record of delivering durable, high-performance coating systems in demanding environments. With fast-curing formulations and exceptional adhesion properties, Wasser coatings provide reliable protection while significantly reducing downtime during application. Their ability to perform in a variety of conditions made them an ideal solution for a high-profile, continuously operating facility like Nike’s headquarters.
Floor System
Primer- MC-Universal 3.0 - 5.0 Mils DFT
- MC-Luster 2.0 - 4.0 Mils DFT
- MC-CLear 1.0 - 2.0 Mils DFT